Build it as code. Prove you can recover.

Build the shared cloud foundation as code, test its guardrails and restore each in-scope system from an isolated backup. Record the result against the agency’s recovery objectives.

Illustrative diagram of a landing zone of accounts inside a dashed guardrail boundary, with a backup vault and a restore path, asking whether it is built as code, whether every guardrail is tested, when the last restore ran and whether recovery objectives were met.
Guardrails you can test. Recovery you have seen work.

A landing zone built as code

A landing zone is the shared foundation of accounts, identity, network connections and logging. We define the in-scope foundation in version-controlled code and record approved exceptions.

Test guardrails against the provider’s configuration guidance and applicable agency baselines. Use least-privilege access and record configuration drift for correction.

New guardrails start in audit mode. They move to enforcement only after the findings are reviewed and the affected teams know what will change.

The system owner accepts the guardrail promotion record before enforcement. Unexplained denials keep it in audit mode with a dated retest.

Recovery from a tested plan

Use a business impact analysis to agree how long a system may be unavailable and how much data loss is tolerable. These are its recovery time and recovery point objectives.

The contingency plan draws on NIST SP 800-34 Rev. 1. Schedule restores from isolated, protected backups and record the elapsed time and recovered data point against those objectives.

How the provider’s recovery and yours fit together is written down and exercised, and every service level carries its metric, how it is measured and what happens when it is missed.

What to look for

Is it built as code?

The foundation deploys from code in government repositories. Approved exceptions are recorded and reviewed.

Is every guardrail tested?

Each guardrail has an automated test that runs on every change.

When was the last restore?

Each system has a dated restore test from an isolated copy.

Were recovery objectives met?

A missed recovery objective keeps that system’s recovery gate open. Correct the cause and repeat the test before acceptance.

What your contracting officer needs

State where platform code is kept, the guardrail test reporting, the restore test schedule and record, and the service level content: metric, measurement method and enforcement.

Who decides at this step

The platform owner approves the platform. Each system owner approves recovery objectives and the contingency plan. The authorizing official keeps the risk decisions.

A technical test record is evidence, not government acceptance. Missing approval holds the step open.

Safeguards

Our role is stated. Your decisions stay yours.

Your officials decide placement, accept the platform and its recovery plans, and set the service targets. We work on the platform and tools your agency approves, and we never sign acceptance on your behalf. Read our safeguards and the environment baseline review.

The contract defines the scope and records any exclusions. Your designated officials approve the work; the contracting officer’s representative records acceptance within the written delegation. Missing evidence or approval keeps the step open, with an owner and a date to correct and retest it.